BRUGG eConnect
  • Home
  • News
  • E-Mobility
  • Industry
  • Wind Power
  • Company
    • About us
    • Data Sheets
    • Career
    • Sustainability
    • BRUGG Group
  • Contact
  • English
    • Deutsch
Select Page
Is Europe ready for e- trucks and megawatt charging systems?

Is Europe ready for e- trucks and megawatt charging systems?

BRUGG eConnect AG was pleased to participate in the 2nd CharIN Conference on June 28, 2022 with Patrick Kern as speaker. He discussed with other relevant industry contacts the topic: is Europe ready for e-trucks? Manufacturers need new charging technologies such as...
  • High Power Charging Lรถsungen am Solar Butterfly Event๐—ง๐—ต๐—ฒ SolarButterfly ๐—ฎ๐—ฟ๐—ฟ๐—ถ๐˜ƒ๐—ฒ๐˜€ ๐—ฎ๐˜ ๐—ผ๐˜‚๐—ฟ ๐—ณ๐—ฎ๐—ฐ๐˜๐—ผ๐—ฟ๐˜† ๐—ถ๐—ป ๐— ๐—ถ๐—ฒ๐—ฑ๐˜‡๐˜†๐—ฟ๐˜‡๐—ฒ๐—ฐ๐˜‡ ๐Ÿฆ‹
  • High Power Charging Solution BRUGG eConnect presents steps to the Megawatt Charging SystemIs Europe ready for e- trucks and megawatt charging systems?
  • Schnellladekabel und SteckerWhat could the future of emission-free transport look like?
  • DC Fast charging cables and connectorsTaking off against climate change: The “Solar Butterfly” spreads its wings
  • HPC DC SchnellladesystemeStart event Solar Butterfly with BRUGG eConnect in Brugg-Windisch